For queries about telescope operation, scientific projects
and telescope time allocation contact: director AT kurp.hut.fi

Metsähovi Radio Observatory,
telescope time allocation

June 2014

Preliminary allocations for the following months:

N/A

If there are "empty" slots in the preliminary schedules, they will most likely be GIX project time.

Preliminary future reservations:

Note: The schedules can change upon a short notice due to
changing demands (multifrequency campaigns, tests etc.)

Observing shift list

Past schedules

Explanations

QSO/GIX = AGN observations 37/22 GHz.
SUN = Solar observations 37 GHz or 3 mm.
EVN VLBI = EVN VLBI, 22 GHz.
mm-VLBI = Millimetre-VLBI, 2/3 mm.
eVLBI = eVLBI or other ad hoc tests.
Geo-VLBI = Geodetic VLBI, 2+8 GHz.
maint = Maintenance, various activities, incl. tests.
teaching = Teaching, lab. exercises.