Previous
Next
Contents
- Wunderlich to distribute the vacuum switching memo
together with a blank PCB to upgraded EVN observatories
before end of July.
- All stations planning to use vacuum switching: adjust
your tape recorder now for 15in operation with thick tape.
- Perea remebered that he had got an email about
suitable recontouring tapes and he promised to email it
to Ruf for distribution.
- Ruf to ask NRAO for thin tapes for verification of
station compatibility with the VLBA correlator.
Porcas suggested that this can be actually assigned
to Mioduszewski.
- All stations with thin tape upgrade: record (RF/IF) noise
on this thin record quality verification tape and send
it to Socorro for analysis.
- Porcas to ensure that pointers to EVN station
Mark IV capability status table and SCHED setup files for
Mark IV observing can be found in the proposal guide.
- Burgess or Ralph Spencer to organize
this ``VIV kick-off'' meeting.
- All stations: Send updates of station information
(especially including when thin tape is available on your
station) to Porcas
(porcas@mpifr-bonn.mpg.de)
.
- Porcas to contact Mike Garrett (JIVE) to arrange for
station status table updates in JIVE WWW and PI information.
- Ruf contacts Arthur Niell (Haystack) to get details
of the thin tape purchase plans of the geodetic community
and to discuss the possibility of combining purchases.
- Himwich to encourage geodetic stations to
use Track, either the Web or the terminal version.
(Contact ``
vlbatape@nrao.edu
'' for new station
arrangements and passwords.)
- All stations: list the boundary conditions and timescales
for reaction to target of opportunity proposals.
- Perea to send JPL IF switchbox capabilities
documentation to Ruf. Altunin to email possible
Web references about the box to Ruf.
- Ruf to send the block schedule to DSN/Madrid as
early as possible indicating especially the CAL
observation.
- Gurvits to ask Rolf Schwarz (MPIfR/Bonn) for an
ASCII version of the block schedule and to arrange that it
gets updated to JIVE Web pages.
- Gurvits contacts Richard Schilizzi (JIVE) to enforce
the EVN Board of Directors' meeting decision in March 1997
to provide 24 hours before the beginning of a given session
for system checkout, plus an additional 12 hours before each
frequency change.
- Porcas to ``publicize'' on the
``
evntech@nfra.nl
'' mailing list the email addresses of
the PIs of a given session at the moment when the schedule
files should be frozen on ``astbo1
''. This enables
station technical friends to easily contact PIs for
clarifications.
- Gurvits: to recommend to the EVN Board of Directors
(BD) that manpower to
scheduling software should be allocated.
- Porcas promised to make sure that next call for
proposals will include enough pointers that the PIs can
understand the new features available with
SCHED+VEX+Mark IV.
- Burgess will talk to Ralph Spencer (Jodrell) about a
possible candidate for writing Linux/FS-compatible control
software and asks Ralph to add this to the EMU/VIV meeting
agenda in September.
- Whenever the amplitude calibration of a given station is
off by more than 5%, Conway feeds this back to
station(s) involved.
- Conway to make sure that all JIVE support scientists
know about good calibrators and will recommend putting
them into schedules.
- Porcas to distribute guidelines to proposers as how
to propose a ``TOO'' to the EVN.
- Altunin to send DSN scheduling and station contact
information to ``
jive@jive.nfra.nl
'' for inclusion in
JIVE/EVN Web pages
http://www.nfra.nl/jive/evn/network/members.html.
- Mioduzsewski to look up this information, i.e. how
to arrange access to ``weight plots'' and send the
results of this to ``
evntech@nfra.nl
''.
- Foley to send these Westerbork updates to
Porcas for inclusion to the EVN status table.
Previous
Next
Contents