EVN OM---FS Contribution

Ari Mujunen, Ari.Mujunen@hut.fi

v1.0, 19 August 1996


(This document contains a few main section headings besides "4. FS", since I would like to refer to them and I want to make sure that the referred number stays correct.)

1. SCHEDULING

2. PRE-SESSION SETUP/TEST

3. GPS TIMING

4. FIELD SYSTEM